TOP 5 CHALLENGES
For Multi-Cloud Connectivity

  • TIME TO MARKET

    1. TIME TO MARKET

    Typical lead time for MPLS connectivity is between 60 to 90 days. This is because of complex technical and commercial requirements.

  • BANDWIDTH & LATENCY

    2. BANDWIDTH & LATENCY

    For MPLS solutions, bandwidth is the bottleneck and for Internet based cloud connectivity. Latency is the single biggest drawback.

  • APPLICATION PERFORMANCE

    3. APPLICATION PERFORMANCE

    Most cloud connectivity solutions don’t have built-in mechanisms to accelerate cloud applications like Office365 and Salesforce.

  • HYBRID 
CLOUD

    4. HYBRID CLOUD

    Multi-Cloud and Hybrid Cloud are a reality in most organizations. Traditional solutions lack an effective approach for connectivity between different cloud environments.

  • COST PERFORMANCE 
TRADE-OFF

    5. COST PERFORMANCE TRADE-OFF

    There is a cost performance trade-off in traditional cloud connectivity solutions that use MPLS or internet. MPLS is expensive and the internet has performance issues.

ARYAKA SOLUTION
Managed On-Demand SD-WAN

SD-WAN for Multi-Cloud connectivity

Feel free to use the infographic on your blog/website with appropriate attribution to Aryaka.

Copy the code in the text area below: